
The Norwegian Minister of Petroleum and Energy, Mr. Ola Borten Moe, was visiting ChapDrive’s Test site at Valsnes the 27th June. The minister had been visiting the region for a series of meetings and events, and took the opportunity to have a look at the test site and the installation. Project director Thor Schjetne explained the function on the 225 kW and 900 kW wind turbines equipped with ChapDrive hydraulic transmission.